Description of Goods:
1. Line of production

2. Test Tools

3. Packaging and Delivery

Q1:How about the quality?
A:Third party inspections are always welcomed, like TUV, BV, SGS. All of the goods will be released together with MTC and stamped by TPI.
Q2: Can you accept customization?
A: Yes.we can do customization for you.
Q3: Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-30 days if not in stock.
Q5: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.
1 | Product Name | ASTM A335 P1, P2, P5, P9, P11, P12, P22, P23, P91, P92 Alloy Steel Boiler Tube |
2 | Steel Grade | P1, P2, P5, P9, P11, P12, P22, P23, P91, P92 |
3 | Production Standard | ASTM A335 |
4 | Dimensions | OD: 12.7-610mm, WT: 1.5-60mm, Length: Random Length / Fix Length / As Per Request |
5 | Pipe End | Plain End / Beveled End With Caps / Customer Requirements |
6 | Packing | Standard export seaworthy package, or as required. |
7 | Delivery Time | 15-20 working days, or according to the products |
8 | Certificates | TUV, BV, SGS, ISO9001, ISO14001, ISO18001, CE FPC |
9 | Quality | MTC will be provided with goods, third part inspection is acceptable, for example BV,SGS, LR, TUV |
10 | Applications | 1. Seamless steel pipe for building construction 2. Seamless steel pipe for heat exchangers and condensers 3. Seamless steel pipe for high, low and medium pressure boiler 4. Machinery , electric power station 5. liquid service, petroleum & natural gas storage, water, oil transport, oil well and coupling 6. automobile axle sleeve and automobile fittings Others |
1. Line of production

2. Test Tools

3. Packaging and Delivery

Q1:How about the quality?
A:Third party inspections are always welcomed, like TUV, BV, SGS. All of the goods will be released together with MTC and stamped by TPI.
Q2: Can you accept customization?
A: Yes.we can do customization for you.
Q3: Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.
Q4: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-30 days if not in stock.
Q5: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.